What Is Mrp Group And What Is The Use Of It? |
|
Answer» MRP Groups In this step, you can carry out the total maintenance of the MRP groups and you can allocate a material type to an MRP group. The MRP group is an organizational object that can be used to allocate special control parameters for planning to a group of MATERIALS. You can maintain MRP groups if planning control per plant is not precise enough for your requirements and you want to allocate certain material groups different control parameters from the plant parameters. For this purpose, MRP groups are DEFINED with these specific control parameters and are assigned to the material in the material master record (MRP 1 screen). For example, the following control parameters can be set for the total planning run:
The following is valid for total planning and single-item planning: for all materials without an MRP group, the system uses the plant parameters, or the entries in the initial screen of the planning run for all materials with an MRP group, the system uses the parameters recorded in the MRP groupning run (creation of purchase MRP Groups In this step, you can carry out the total maintenance of the MRP groups and you can allocate a material type to an MRP group. The MRP group is an organizational object that can be used to allocate special control parameters for planning to a group of materials. You can maintain MRP groups if planning control per plant is not precise enough for your requirements and you want to allocate certain material groups different control parameters from the plant parameters. For this purpose, MRP groups are defined with these specific control parameters and are assigned to the material in the material master record (MRP 1 screen). For example, the following control parameters can be set for the total planning run: The following is valid for total planning and single-item planning: for all materials without an MRP group, the system uses the plant parameters, or the entries in the initial screen of the planning run for all materials with an MRP group, the system uses the parameters recorded in the MRP groupning run (creation of purchase |
|