Saved Bookmarks
| 1. |
What is procedure of testing OTG? |
|
Answer» Testing of OTG: 1. Connect to 15A mains connection and switch on power 2. Set temp to highest temperature. 3. Select dual heating point and Power on OTG for 5 sec and turn it off. Touch the tube for checking heat. 4. Check the rotation tube for the same process. 5. Check the FAN. |
|