1.

What is procedure of testing OTG?

Answer»

Testing of OTG:

1. Connect to 15A mains connection and switch on power 

2. Set temp to highest temperature. 

3. Select dual heating point and Power on OTG for 5 sec and turn it off. Touch the tube for checking heat. 

4. Check the rotation tube for the same process. 

5. Check the FAN.



Discussion

No Comment Found

Related InterviewSolutions