Answer» If you select this "Retro" option in Scheduling tab, job can be scheduled to run evenafter actual scheduling date has been PASSED. Ex: If a job scheduled to run on 20TH of every month, but on 20th the Control-MServer is down, and Came up on 21st or later, then while performing the New dayProcess Control-M will check for this option and BRING the job into AJF though thejob scheduled date has been crossed. If you select this "Retro" option in Scheduling tab, job can be scheduled to run evenafter actual scheduling date has been passed. Ex: If a job scheduled to run on 20th of every month, but on 20th the Control-MServer is down, and Came up on 21st or later, then while performing the New dayProcess Control-M will check for this option and bring the job into AJF though thejob scheduled date has been crossed. |
|