Identify the Scenarios → PLAN the LOAD Test → DESIGN The load Test (Scripting the Vuser) → Create the Scenario (Controller) → Design Scenario → Execute Scenario → Monitor the Scenario → GENERATE the REPORT → Analyse the Report

Identify the Scenarios → Plan the Load Test → Design The load Test (Scripting the Vuser) → Create the Scenario (Controller) → Design Scenario → Execute Scenario → Monitor the Scenario → Generate the Report → Analyse the Report