What Is The Use For Cable Entry In Control Room? (sleeves & Mct)

Answer»

In the process plant Control room built considering the non-hazardous area. So in case if fire/Explosion TAKES PLACE in the plant than that has to be restricted from entering into the control room. So MCT (Multiple cables transient) blocks are used. They are designed to sustain the fire for fixed time DURATION. That block holds the cables which are entering into the CCR.

In the process plant Control room built considering the non-hazardous area. So in case if fire/Explosion takes place in the plant than that has to be restricted from entering into the control room. So MCT (Multiple cables transient) blocks are used. They are designed to sustain the fire for fixed time duration. That block holds the cables which are entering into the CCR.