1.

What Mrp Procedures Are Available In Mm-cbp (consumption Based Planning)?

Answer»

Various material planning methods are used in MRP (Material Requirements Planning).

  • Reorder POINT PROCEDURE (VM)
  • Forecast-based planning (VV)
  • Time-Phased MATERIALS planning (PD)
  • These are specified in material CREATION (MM01) under the MRP 1 tab.

Various material planning methods are used in MRP (Material Requirements Planning).



Discussion

No Comment Found