InterviewSolution
Saved Bookmarks
| 1. |
Which of the following activities may be included in a real-time software design process?(a) Platform selection(b) Timing analysis(c) Process design(d) All of the mentionedThe question was posed to me in a job interview.Enquiry is from Embedded Software in portion Advanced Software Engineering of Software Engineering |
|
Answer» The CORRECT ANSWER is (d) All of the mentioned |
|