InterviewSolution
Saved Bookmarks
| 1. |
Which of the following is included in SRS ?(a) Cost(b) Design Constraints(c) Staffing(d) Delivery ScheduleI have been asked this question by my school teacher while I was bunking the class.I need to ask this question from Requirement Documentation in section Requirement Engineering of Software Engineering |
|
Answer» Correct option is (b) Design CONSTRAINTS |
|