1.

Works like earthwork and cement concrete are measured in ________(a) Square metres(b) Metres(c) Litres(d) Cubic metresI have been asked this question during a job interview.The above asked question is from Rate Analysis in section Rate Analysis, Estimation and Costing of Construction & Building Materials

Answer»

The CORRECT CHOICE is (d) Cubic metres

Explanation: Works like earthwork and cement concrete are measured in cubic metres. These works contain CUBICAL contents and involve VOLUMES and hence these are measured in m^3.