| 1. |
Sleepers (ties) are mostly made up of _______________(a) wood(b) prestressed concrete(c) metal(d) steakI had been asked this question in my homework.Enquiry is from Railway Line topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (b) prestressed concrete |
|
| 2. |
Normally earthwork is estimated for 30 m lead for distance and 1.5 m lift for height or depth, and this distance of 30 m and the height of 1.5 m are known as _____________(a) vertical lead and lift(b) normal lead and lift(c) horizontal lead and lift(d) transverse lead and liftI had been asked this question in final exam.My question comes from Estimate of Earthwork by Three Methods in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right OPTION is (b) normal lead and LIFT |
|
| 3. |
____________ is the predominant gauge used by Indian railways.(a) Broad gauge(b) Narrow gauge(c) Metre gauge(d) Standard gaugeThis question was addressed to me by my college professor while I was bunking the class.I need to ask this question from Railway Line in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct OPTION is (a) BROAD gauge |
|
| 4. |
Name the open drains provided for conveying water from kitchens, bathroom and rain water to main sewers.(a) drains(b) Sewers(c) Soak pit(d) Surface drainsThis question was posed to me during an online exam.My question comes from Water Supply Works in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right ANSWER is (d) Surface drains |
|
| 5. |
The lowest or weakest level of decontamination is sanitation.(a) True(b) FalseThe question was posed to me in class test.This interesting question is from Sanitary Works topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right option is (b) False |
|
| 6. |
What is the longitudinal slope called?(a) Kerb(b) Horizon(c) Grade(d) LiftThis question was posed to me in an internship interview.This is a very interesting question from Estimate of Earthwork by Three Methods topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right OPTION is (c) Grade |
|
| 7. |
Figure shown below represents a symbol ‘A’, it signifies?(a) Septic tank(b) Soak pit(c) Gutter(d) Water storing tankI have been asked this question in my homework.Question is from Design of Septic Tanks topic in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (a) SEPTIC tank |
|
| 8. |
As a very general guideline it is recommended that the bottom of the pit should be at least _______ above groundwater level.(a) 0.5 m(b) 2 m(c) 12 m(d) 20 mI have been asked this question in an interview for internship.Question is taken from Design of Septic Tanks topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct option is (b) 2 m |
|
| 9. |
The surface of the head of each of the two rails can be maintained by using a ___________(a) rail header(b) rail trimmer(c) rail grinder(d) rail cutterI had been asked this question in homework.I need to ask this question from Railway Line topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct choice is (c) rail GRINDER |
|
| 10. |
In office building what is the requirement of a water closet for 50 persons?(a) 4(b) 5(c) 2(d) 1I have been asked this question in an online interview.This interesting question is from Water Supply Works in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» RIGHT answer is (c) 2 The explanation: In OFFICE building the requirement of a water closet for 25 people or PART THEREOF, 1 closet is required. |
|
| 11. |
__________ is the highest form of decontamination.(a) Sterilization(b) Sanitation(c) Disinfection(d) HygieneI have been asked this question by my school principal while I was bunking the class.Origin of the question is Sanitary Works in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (a) Sterilization |
|
| 12. |
The shape of ballast should be _____________(a) triangular(b) irregular(c) spherical(d) longitudinalThis question was addressed to me at a job interview.My question comes from Railway Line in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» CORRECT option is (b) irregular For explanation: Stones must be irregularly cut, with sharp edges, so that they properly interlock and GRIP the ties in order to fully secure them against movement; spherical stones cannot do this. In order to let the stones fully settle and interlock, SPEED limits are often LOWERED on sections of track for a period of time after NEW ballast has been laid. |
|
| 13. |
A raised edge at the side of the roadway is known as _____________(a) curb(b) curvature(c) inclination(d) circularI got this question by my college director while I was bunking the class.My question is from Estimate of Earthwork by Three Methods topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The CORRECT ANSWER is (a) curb |
|
| 14. |
To calculate the volume of earthwork from contour plan for filling a depression or pond and for cutting a hillock __________________ may be used conveniently.(a) elevation method(b) section area method(c) prismoidal formula(d) contour methodI have been asked this question in semester exam.This question is from Estimate of Earthwork by Three Methods topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (c) prismoidal formula |
|
| 15. |
For 1 wash Basin how many persons are allowed to use it at a time at office buildings?(a) 45(b) 35(c) 25(d) 15The question was asked by my college director while I was bunking the class.I would like to ask this question from Water Supply Works in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct answer is (c) 25 |
|
| 16. |
______ percentage of Indian rails routes are electrified.(a) 66%(b) 25%(c) 45%(d) 76%The question was posed to me in an international level competition.Asked question is from Railway Line in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (c) 45% |
|
| 17. |
The _______ are used for preventing foul gas from sewers to back flow in the house.(a) air freshners(b) traps(c) naphthalene balls(d) phenylI got this question in an online quiz.The origin of the question is Water Supply Works in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct answer is (b) traps |
|
| 18. |
In _________________ system the source of supply is lake or impounding reservoir at some elevation.(a) parallel(b) gravity distribution(c) pumps distribution(d) rain distributionI got this question during an interview.The origin of the question is Water Supply Works in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct choice is (b) gravity distribution |
|
| 19. |
The distance shown by red line represents ______________(a) separation(b) parallel way(c) height(d) gaugeThe question was posed to me during an online interview.The above asked question is from Railway Line topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» RIGHT option is (d) gauge To elaborate: During the early days of rail, there was considerable VARIATION in the gauge used by different systems. TODAY, 54.8% of the world’s railways use a gauge of 1,435 mm (4 ft 8 \(\frac{1}{2}\) in), known as standard or international gauge. Gauges wider than standard gauge are called broad gauge; narrower, narrow gauge. Some stretches of TRACK are dual gauge, with THREE (or sometimes four) parallel rails in place of the usual two, to allow trains of two different gauges to use the same track. |
|
| 20. |
_____________ curves are curves which, when viewed from the side, are concave upwards. This includes vertical curves at valley bottoms, but it also includes locations where an uphill grade becomes steeper, or a downhill grade becomes less steep.(a) Sag horizontal(b) Hog horizontal(c) Sag vertical(d) Hog verticalThis question was addressed to me in a job interview.My question is from Estimate of Metalled Roads topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right answer is (c) Sag vertical |
|
| 21. |
Calculate the quantity of cement concrete for cement concreting one kilometre length of 3.70 m wide road for an 8 cm thick layer. Also calculate cost at the rate of Rs.375.00 per cu m.(a) Rs.134440.00(b) Rs.191000.00(c) Rs.111000.00(d) Rs.211000.00The question was posed to me during an interview for a job.The origin of the question is Estimate of Metalled Roads in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» RIGHT choice is (C) Rs.111000.00 For explanation I WOULD say: Quantity of CEMENT concrete = 1000*3.70*0.80 = 296 cu m Cost per kilometre of road = 296*375.00 = Rs.111000.00. |
|
| 22. |
Symbol shown below represents ______________ type of road signal.(a) disabled people(b) crossing area(c) men at work(d) garbage areaThe question was posed to me in unit test.The question is from Estimate of Metalled Roads topic in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (c) men at work |
|
| 23. |
Designated point on a road where road marking or other means helps pedestrians cross safely is called?(a) Zebra crossing(b) Pedestrian crossing(c) Footpath(d) SubwayThis question was addressed to me in an online interview.The query is from Estimate of Earthwork by Three Methods in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (b) Pedestrian crossing |
|
| 24. |
90% of urban water supply and sanitation services are currently in the ______________(a) industry(b) agriculture(c) government(d) public sectorI have been asked this question in an interview for internship.This question is from Water Supply Works topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right CHOICE is (d) public sector |
|
| 25. |
Connecting pipe should be _______ mm minimum diameter.(a) 60(b) 300(c) 700(d) 100This question was addressed to me in an online quiz.My question comes from Design of Septic Tanks in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct ANSWER is (a) 60 |
|
| 26. |
Find the area of permanent land required for a State Highway for one kilometre length, the width of permanent land being 30 m.(a) 0.5 hectare(b) 3 hectare(c) 4 hectare(d) 6 hectareThis question was addressed to me in an interview for internship.This interesting question is from Estimate of Metalled Roads in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct CHOICE is (B) 3 HECTARE |
|
| 27. |
Metalling of road usually consists of ______ layers of coats.(a) 5(b) 3(c) 2(d) 6This question was addressed to me in final exam.My question comes from Estimate of Metalled Roads topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct choice is (b) 3 |
|
| 28. |
The size of the faeces drop hole in the floor or slab should not be larger than ____________(a) 5m(b) 25 cm(c) 45 cm(d) 250 mmI had been asked this question in homework.My question is from Design of Septic Tanks in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right answer is (b) 25 cm |
|
| 29. |
A road junction where typically three or more roads are joined by a circular section of road is called _________(a) intersection(b) merging(c) circulation(d) roundaboutI have been asked this question in final exam.I need to ask this question from Estimate of Metalled Roads in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct answer is (d) roundabout |
|
| 30. |
Find the area of temporary land required for one kilometre length of a road from the following data.(a) 32.50 m(b) 76.89 m(c) 39.50 m(d) 45.50 mThis question was posed to me in an online interview.Asked question is from Estimate of Metalled Roads in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» RIGHT ANSWER is (a) 32.50 m Easy explanation: Quantity of EARTHWORK in embankment = (Bd+sd2)*length = (10*1.5+2*1.52)*1000=19.5*1000=19500 Area of temporary in embankment land=(19500)/(depth of borrowpit)=19500/0.30=65000 sq m 65000/10000=6.5 hectare Width of temporary land = Area /Length = 65000 sq m/10000 = 65 m Width of temporary land on either side = 65/2 = 32.50 m. |
|
| 31. |
Cross-section of earthwork of road in banking is in the form of trapezium. Name the method to calculate the quantity of earthwork.(a) Longitudinal formula(b) Quadrilateral formula(c) Prismoidal formula(d) Trapezium formulaI had been asked this question during an interview.My doubt is from Estimate of Earthwork by Three Methods topic in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct ANSWER is (c) Prismoidal formula |
|
| 32. |
As of 2013 pit latrines are used by an estimated ____________ people.(a) 1.77 billion(b) 2.77 million(c) 1.77 billion(d) 4.66 billionThis question was posed to me in final exam.My doubt stems from Design of Septic Tanks topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct OPTION is (c) 1.77 BILLION |
|
| 33. |
Anti-siphonage pipe is connected to _____________(a) top of P trap W.C.(b) main soil pipe(c) bottom of P trap W.C.(d) side of water closetThe question was asked in an interview for internship.The origin of the question is Sanitary Works in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (c) bottom of P trap W.C. |
|
| 34. |
The track and ballast form the ______________(a) Temporary way(b) True way(c) Rigid way(d) Permanent wayI had been asked this question in class test.I'd like to ask this question from Railway Line topic in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right answer is (d) Permanent way |
|
| 35. |
Below symbols refer to ____________(a) additional signs(b) cautionary sign(c) mandatory sign(d) informative signThe question was posed to me by my school principal while I was bunking the class.My question is based upon Estimate of Metalled Roads topic in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct CHOICE is (c) mandatory sign |
|
| 36. |
Calculate the quantity of metal required for a 3.70m wide Macadam road for one kilometre length for one layer of 8 cm compacted thickness.(a) 444 cu m(b) 565 cu m(c) 454 cu m(d) 765 cu mI got this question in my homework.My query is from Estimate of Metalled Roads in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct choice is (a) 444 cu m |
|
| 37. |
Typical lane widths range from ______ metres to _____ metres.(a) 1, 2.4(b) 10, 12.6(c) 3, 3.6(d) 8, 8.6I got this question in an interview for job.My doubt stems from Estimate of Earthwork by Three Methods in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct ANSWER is (c) 3, 3.6 |
|
| 38. |
Soak pit shall not be less than ____________(a) 45 cm(b) 90 cm(c) 50 cm(d) 100 cmI got this question in final exam.I would like to ask this question from Design of Septic Tanks in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right option is (b) 90 cm |
|
| 39. |
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended ________(a) 100 mm(b) 150 mm(c) 210 mm(d) 400 mmI have been asked this question by my school teacher while I was bunking the class.Question is from Sanitary Works in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (B) 150 mm |
|
| 40. |
Sanitary plumbing includes the installation of appliances such as dishwashers and washing machines; the replacement or repair of taps, ball valves and plugs.(a) True(b) FalseI got this question during an online exam.I'm obligated to ask this question of Sanitary Works topic in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (B) False |
|
| 41. |
In this form of track, the rails are welded together by utilising flash butt welding to form one continuous rail that may be several kilometres long, this type of rail is called __________(a) Continuous jointed rail(b) Merged rail(c) Continuous welded rail(d) Continuous welded railThis question was addressed to me during an internship interview.I need to ask this question from Railway Line in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (c) Continuous WELDED rail |
|
| 42. |
Number of urinals required in hostels for 25 persons.(a) 5(b) 1(c) 5(d) 10The question was asked by my school teacher while I was bunking the class.My question is from Water Supply Works topic in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct OPTION is (b) 1 |
|
| 43. |
Septic tank is usually consists of brick wall in cement not less than _______(a) 20 cm(b) 100 cm(c) 80 cm(d) 200 cmThis question was addressed to me by my college professor while I was bunking the class.The doubt is from Design of Septic Tanks topic in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» RIGHT choice is (a) 20 cm The best EXPLANATION: Septic TANK is usually consists of BRICK wall in cement not less than 20cm(9”) thick and the foundation floor are of cement concrete 1:3:6 or 1:2:4. Both inside and outside faces of wall and floor are PLASTERED with a minimum thickness of 12mm thick cement mortar 1:3 and all inside corners are rounded. |
|
| 44. |
A ________ is a thoroughfare, route, or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance, including a motor vehicle, cart, bicycle, or horse.(a) harbour(b) hole(c) lift(d) roadThis question was posed to me in class test.My question is from Estimate of Earthwork by Three Methods in section Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» The correct option is (d) road |
|
| 45. |
A _____________ houses the squatting pan or toilet seat and provides privacy and protection from the weather for the user.(a) roof(b) terrace(c) shade(d) shelterThis question was posed to me during an online interview.My doubt is from Design of Septic Tanks topic in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct option is (d) shelter |
|
| 46. |
A _________ is a type of toilet that collects human faeces in a hole in the ground.(a) gutter(b) septic tank(c) pit toilet(d) latrineThe question was posed to me in an internship interview.My question is taken from Design of Septic Tanks in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Correct option is (c) pit toilet |
|
| 47. |
Road on the side of a cliff or mountain, with the ground rising on one side and falling away on the other is called _________(a) hill(b) corniche(c) cliff(d) coneThe question was asked during an online exam.This intriguing question originated from Estimate of Metalled Roads in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (b) CORNICHE |
|
| 48. |
__________ forms the trackbed upon which railroad ties (sleepers) are laid.(a) Track ballast(b) Concrete ballast(c) Rail ballast(d) Wooden ballastI have been asked this question during a job interview.The above asked question is from Railway Line in division Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (a) Track ballast |
|
| 49. |
Which type of trap is shown by the figure below?(a) S- trap(b) P- trap(c) Q-trap(d) R-trapThe question was asked in an interview for internship.My question is from Water Supply Works topic in chapter Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|
Answer» Right choice is (a) S- trap |
|
| 50. |
The pit is typically at least ____________ deep and ___________ across.(a) 14 meters, 10 m(b) 30 meters, 15 m(c) 3 meters, 1 m(d) 11 meters, 9 mThe question was posed to me by my college professor while I was bunking the class.This key question is from Design of Septic Tanks in portion Road Estimating, Sanitary and Water Supply Work of Civil Engineering Drawing |
|