1.

A and B together can complete a work in3 days. They start together but after 2 days, Bleft the work. If the work is completed aftertwo more days, B alone could do the work in​

Answer»

Answer:

1st Method:

(A+B)'s one DAY's work = 1/3 PART;

(A+B) WORKS 2 days together = 2/3 part;

Remaining work = 1-(2/3) = 1/3 part;

1/3 part of work is completed by A in two days;

Hence, one day's work of A = 1/6;

Then, one day's work of B = 1/3-1/6=1/6;

So, B alone can COMPLETE the whole work in 6 days.

2nd method:

(A+B)'s one day's % work = 100/3 = 33.3%

Work completed in 2 days = 66.6%

Remaining work = 33.4%;

One day's % work of A = 33.4/2 = 16.7%;

One day's work of B = 33.3 - 16.7 = 16.7%;

B alone can complete the work in,

= 100/16.7 = 6 days.