Saved Bookmarks
| 1. |
A can do 1 by 2 of a piece of work in 5 days. B can do 3 by 5 of the same work in 9 days and C can do 2 by 3 of that work in 8 days. In how many days can three of them, together do the work?(1) 3 days (2) 5 days (3) 9 by 2 days (4) 4 days |
|
Answer» Answer: ATQ,A can do 1/2 of the WORK in 5 days => A can do the WHOLE work in 5 × 2/1 = 10 days B can do 3/5 of the work in 9 days => B can do the whole work in 9 × 5/3 = 12 days C can do 2/3 of that work in 8 days => C can do the whole work in 8 × 3/2 days = 12 days. Therefore, ( A + B + C)’s 1 days’ work = 1/10 + 1/15 + 1/12 Hence, A + B + C can COMPLETE the whole work in 4 days |
|