Saved Bookmarks
| 1. |
A complete a work in 30days and B complete same work in 20days.Calculate the time if both A and B do the same work jointly. |
|
Answer» A and B together completes the work in(30 * 20)/(30 + 20) = 600/50 = 12 days |
|