1.

A wall needs to be constructed with height 21m. It should be able to store 16.5 lakh liters of water. The volume of earth dig out is 2376 m3. What is the volume of concrete to be mixed to build the well?

Answer»

A wall needs to be constructed with height 21m. It should be able to store 16.5 lakh liters of water. The volume of earth dig out is 2376 m3. What is the volume of concrete to be mixed to build the well?



Discussion

No Comment Found