1.

At the construction stage, binding wires ____________(a) Should touch the formwork(b) Should not touch the formwork(c) To be turned outside(d) To be turned whole structureI had been asked this question during an interview.I'd like to ask this question from Symptoms and Diagnosis of Distress in section Repair Technology for Concrete Structures of Concrete Technology

Answer»

The correct OPTION is (b) Should not TOUCH the formwork

The explanation: Binding wires to be TURNED INSIDE (should not touch formwork). G.I. wires to be used in AGGRESSIVE environment.