1.

What is the moisture content in slurry for wet process?(a) 35-50%(b) 12%(c) 40-45%(d) 100%This question was posed to me at a job interview.Origin of the question is Defects Occurring During Construction in portion Repair Technology for Concrete Structures of Concrete Technology

Answer»

The CORRECT OPTION is (a) 35-50%

Best explanation: The MOISTURE CONTENT in SLURRY for wet process is 35-50%. 12% is the moisture content for dry process.