1.

Dry intervals in surface wetting leads to ___________(a) Cracking(b) Fogging(c) High strength(d) Good workabilityThe question was posed to me in class test.The origin of the question is Concrete Repair System topic in chapter Admixtures and Construction Chemicals of Concrete Technology

Answer» CORRECT choice is (a) CRACKING

The explanation is: Dry intervals or PATCHES can lead to crazing or cracking on the slab surface.


Discussion

No Comment Found

Related InterviewSolutions