1.

find the cost of tilling an office floor 20 m long and 15 m broad at the rate of RSs. 05 per sq. m.​

Answer»

Answer:

The cost of tile per SQ. METER is not given properly.. Kindly read the question before asking.

Step-by-step explanation:

Area of OFFICE floor = length * breadth

                                = 20m * 15m = 300 m sq.

Cost of 1 mt sq = 5.05 Rs (not clear)

Then cost of floor is = 5.05 * 300 = 1.515 sq mt.



Discussion

No Comment Found