Saved Bookmarks
| 1. |
Find the cost of tilling Rectanglar plot of land 300m long and 150m wide at the rateof 4 cedies per 100 square meter? |
|
Answer» 270,000Step-by-step EXPLANATION:a = LW a = 300)(150)a = 45,000then multiply this by 6 to find the TOTAL cost45,000 (6) = 270,000so the cost of the PLOT is 270,000 |
|