Saved Bookmarks
| 1. |
Find work done to bring a rest charge q_(0) from point A to point B, slowly. All parameters are in S.I. units. |
|
Answer» Solution :`W_(A rarr B) = U_(B) - U_(A) = q_(0) (V_(B) - V_(A))` `= [-(K(qa))/(125) - ((K(qa)(7))/(125))]` `rArr W_(A rarr B) = (Kq q_(0)a)/(125)(8)` |
|