InterviewSolution
Saved Bookmarks
| 1. |
Give reason:Continuous contour trenches are constructed along the slopes. |
|
Answer» (i) Construction of continuous contour trenches (CCTs) at different heights checks the velocity of water running along the slopes. (ii) This reduces soil erosion. |
|