VERIFY pipe material thickness by Vernier at the end or UT on SURFACE or stenciling done by the manufacturer (VISUAL) or heat number, TRACEABILITY by MTC of PRODUCT.

Verify pipe material thickness by Vernier at the end or UT on surface or stenciling done by the manufacturer (visual) or heat number, traceability by MTC of product.