All materials shall have material spec and grade stamped or stenciled & clearly marked with permanent marker.
All materials, heat no. will be made TRACEABLE to MTC from approved vendor & no material substitution will be done without proper approval from the company.
All materials shall be STORED & stacked separately as per material grade.
Heat no. shall be transferred before cutting into pipes that have to be cut.