How Does A Selector Assess The Eligibility Of Server Resources?

Answer»

Selection of a server resource for any PROJECT depends on the system used by the selector, which assesses them by following methods:

At FIRST, the system collects the list of servers, which contain the needed VARIABLES. If server resource does not match the necessary criteria, then the project fails, and method CREATES a note accordingly.

In the scenario where more than one server meets the needed criteria, the system rates each of the eligible servers and allocates the point as follows:

  1. One single point is for each optional matching variable. If the selector consists, more than a copy of the variable, then the system allocates one point/copy.
  2. One point is mapped to the server having the lowest BF_LOADRATIO value.

System selects the server which received most of the points. If there is more than one server having the maximum points, then the system chooses one of them.

Selection of a server resource for any project depends on the system used by the selector, which assesses them by following methods:

At first, the system collects the list of servers, which contain the needed variables. If server resource does not match the necessary criteria, then the project fails, and method creates a note accordingly.

In the scenario where more than one server meets the needed criteria, the system rates each of the eligible servers and allocates the point as follows:

System selects the server which received most of the points. If there is more than one server having the maximum points, then the system chooses one of them.