I Need To Schedule A Background Job To Run For 3 Consecutive Days And Would Like To Use Db13. How Can I Schedule A Report To Run From Db13 And Not Sm37?

Answer»

There is no way to schedule a REPORT to run from DB13 other than pre-configured DBA jobs. Instead, use SM36 and MAKE the jobs EVENT driven.

There is no way to schedule a report to run from DB13 other than pre-configured DBA jobs. Instead, use SM36 and make the jobs event driven.