if 22 men can dig 13(1/2) long canal in a day , how many men should be employed for digging 20(1/4) metre long canal of the same type in on day |
|
Answer» Step-by-step explanation: MEN : Length trench :: Men : Length of trench X = (22 135)/27 = 110 men |
|