If 9 trucks can be loaded by workers in 6 3by 4 hours how much time will be taken by the same.number of workers to loaded 4 such trucks |
| Answer» 9 trucks = 63/4 hrs.1 TRUCK = 63/4 multiplied by 1/9 = 7/4Therefore, 4 trucks = 7/4 multiplied by 4 = 7Therefore, it will TAKE 7 HOURS to load 4 such trucksHope it helps ! | |