In a retrospective, a Scrum team decides to revise the Sprint length. Does the Product Owner need to agree on the new Sprint length?

Answer»

YES, the LENGTH of the sprint can be changed but it should be FIXED before starting the sprint. The product owner needs to ensure that the sprint is short ENOUGH to limit business risk and ALSO short enough so that the team can synchronize their development work with other business events. Finalized Sprint length cannot be longer than 4 weeks (1 month).