1.

Integral Coach Factory (ICF) of Chennai announced the launch of indigenously manufactured semi high-speed train, the train is named as;

Answer» The train has been built in record time of 16 months which usually takes about 2 to 3 years . Train 18 doesn't require an engine to run as it will be self-propelled on electric traction like the metro trains. It will replace existing intercity express trains including Shatabdis. ICF will make six such train sets, out of which two will have sleeper coaches.


Discussion

No Comment Found