Saved Bookmarks
| 1. |
P could finish 2/5 work in 4 day' and Q could finish 3/5same work in 9 days.they worked together for 5 days and then P left. The remaining work was done by Q. Find the timerequired by Q to finish the remaining work |
|
Answer» answer: If P finished WORK in 2/5 DAYS so you could say 2x5=10 5 \: \: \TIMES \: \: 5=25 5×5=25 so 10/25 is how much works in 4 days and if Q finishes work in 3/5 in 9 days 3 \: \times 5=153×5=15 5x5=25 15/25 But what will hep is how much they work each day P does .5 in ONE day Q does .3x9=2.7 so about .3 is how much he does a day. |
|