Saved Bookmarks
| 1. |
P does a work for 16 days and Q does for 15 days. The wages of 4 days for P is less than wages of 7 days for Q by 4. If 500 is paid to them, find their daily wages. |
|
Answer» p is ABLE to do a PIECE of work in 15 DAYS and Q can do the same work in 20 days. If they can work together for 4 days, |
|