"pm Order With Material Cost" when I Execute A Pm Work Order With Materials Linked To It, I Am Not Able To Get The Planned Cost / Actual Values Of The Materials With The Cost Elements. what Is The Appropriate Setting That Needs To Be Done In Order To Capture The Material Costs With Cost Elements?

Answer»

when I Execute A Pm Work Order With Materials Linked To It, I Am Not Able To Get The Planned Cost / ACTUAL VALUES Of The Materials With The Cost Elements.

what Is The APPROPRIATE Setting That Needs To Be Done In Order To Capture The Material Costs With Cost Elements?

You can do the following:

  1. Ensure your materials have a valuation class assigned.
  2. Ensure your order has planned/actual costing variants assigned (last TAB).
  3. Ensure your value categories are CORRECT.
  4. Check the costs via the planned/actual report button on the Cost tab.

You can do the following: