"requirement Date For Components" can Anyone Tell Me If It's Possible To Have Different Requirements Dates For Materials On The Component List Of A Work Order. we Have A Number Of Components That Are Required On Different Days. i Tried Using The Off-set, But With No Luck. it Appears That The Requirement Date Is The Same As The Basic Start Date; Can This Be Changed For Each Component? |
|
Answer» can Anyone Tell Me If It's Possible To Have Different Requirements Dates For Materials On The Component List Of A Work Order. we Have A Number Of Components That Are Required On Different Days. i Tried Using The Off-set, But With No Luck. it Appears That The Requirement Date Is The Same As The Basic Start Date; Can This Be Changed For Each Component? You can check the ‘scheduling parameters’ in customizing. You NEED an OPTION with ‘operation dates’ in stead of ‘order dates’. The standard setting for PM and CS orders is forward scheduling. The planned-dates for components therefore take the start date of the operation (not order header) as the starting point for the CALCULATION. Days are added/subtracted from VARIOUS dates in the order and material master to determine the estimated delivery dates. This is performed for each INDIVIDUAL material/component. Take note that each component can have a different offset. You can check the ‘scheduling parameters’ in customizing. You need an option with ‘operation dates’ in stead of ‘order dates’. The standard setting for PM and CS orders is forward scheduling. The planned-dates for components therefore take the start date of the operation (not order header) as the starting point for the calculation. Days are added/subtracted from various dates in the order and material master to determine the estimated delivery dates. This is performed for each individual material/component. Take note that each component can have a different offset. |
|