Saved Bookmarks
| 1. |
Should I Meet With The Airport Authority Regarding A Change To The Letter-of-agreement (loa) Every Time We Have Construction? |
|
Answer» LOA changes that include REDEFINITION of the MOVEMENT area(s) may simplify FAA CONTROLLED operations during construction LOA changes that include redefinition of the movement area(s) may simplify FAA controlled operations during construction |
|