1.

The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from node 1 to node 6 is 7

Answer» The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from node 1 to node 6 is




  1. 7


Discussion

No Comment Found