The fraction of time during a given period that the turbine is actually on line is called?(a) Availability factor(b) Flat rating(c) Cut in velocity(d) Cut out velocityThis question was addressed to me during an interview for a job.I'm obligated to ask this question of Wind Turbine Operation in section Wind Energy of Energy Engineering |
|
Answer» The correct option is (a) AVAILABILITY FACTOR |
|