1.

The long run is a

Answer»

 PERIOD long enough to allow FIRMS to change plant size and CAPACITY



The period is long enough to allow firms to change plant size and capacity. The long run is a period of TIME in which all factors of PRODUCTION and costs are variable. In the long run, firms are able to adjust all costs.



Discussion

No Comment Found