Saved Bookmarks
| 1. |
They should take up bracing position.[Unit-6. Lesson-6)Part B: Unseen PartRead the following text and answer questions 4 and 5:The Padma Bridge is a multipurpose birdge in Bangladesh. It is being built across the Padma River. This bridge isnow under construction. It will connect Loughajong, Munshiganj to Shariatpur and Madaripur. It will connect 21southern districts with the capital. Padma Bridge is the most expensive project in the history of Bangladesh. Therewill be highway on the upper level and a railway line on a lower level. It has 150 m span. Its length is 6150 m andwidth is 18.10 m. The project has taken 1062 hectares of land. The total cost of the bridge will be Tk. 92 billion.This total cost has been funded by the government of Bangladesh alone. China Major Bridge Engineering CompanyLtd is doing the overall construction work. This mega' project will be completed by the end of 2019. The bridge willcontribute a lot to the economic development of Bangladesh. It will increase the GDP by as much as 1.2 percent.4. Complete the table below with appropriate information:1x5=5WhoActivity/ WhatRelevant informationPadma Bridgeconnecting(1) - districts.- (ii)doing construction workPadma Bridgetotal land(iii) -| Bangladesh government (iv)for Padma Bridge project.Padına Bridgewill be completed inRead the passage again and write True or False beside the following statements. Give correct answers for1x5=5the false statements:(a) The Padma Bridge is being built across the Jamuna River.(b) It will link southern region to the capital.(c) Bangladesh govt. is financing the project.(d) It is the most expensive project in the history of the world.(e) Padma Bridge will decrease the GDP. |
|
Answer» Explanation: HEY thereI think (C ) is CORRECT answer.plz mark my answer brainlist. |
|