Saved Bookmarks
| 1. |
Three men or eight boys can du a piece of work in 17 days. How many days will two men and six boys together take to finish the same work ?1). 9 days2). 11 days3). 14 days4). 12 days |
|
Answer» Solution Given that , 3 men(M) or 8 boys(B) can do the work in 17 days i.e the CAPACITY of 3 men and 8 boys is same. We need to find , the time taken by 2M + 6B . Replacing M with $\frac{8}{3}$*B we GET 2*$\frac{8}{3}$*B + 6B = $\frac{34}{3}$*B. = 12 days. |
|