InterviewSolution
| 1. |
What are the different MRP parameters? |
|
Answer» MRP parameters are required to run material requirement planning to meet Planned Independent Requirement PIR and to use Routing information. Different MRP parameters can be used − Processing Key − NetChange − In this run system consider those material which has undergone some changes from the previous MRP run. NetChange in planning horizon − This run considers the requirement in predefined planning horizon and not like net change which check the future requirements. In this run, system consider only those material which has undergone some changes from their last MRP run. Regenerative Planning − In this run, system consider all the material irrespective of changes and it is time consuming and not common in Production planning. |
|