1.

What Are The Various Methods For Calculating The Cost?

Answer»

There are two methods for calculating the cost:

  • JOB-Order Cost Method: This method is used when ORDERS are placed in the factory for specific jobs or lots of product, which can be identified through all manufacturing processes, a job cost system is appropriate.
  • PROCESS Cost Method: This product is used when production proceeds in a continuous flow, when units of product are not separately IDENTIFIABLE, and when there are no specific jobs or lots of product, a process cost system is appropriate.

There are two methods for calculating the cost:



Discussion

No Comment Found