| 1. |
How The Costs Of The Products And Throughput Time Can Be Reduced While Handling Materials? |
|
Answer» It can be done by following below mentioned points:
It can be done by following below mentioned points: |
|
| 2. |
How Improvements Can Be Made For Designing The Parts? |
|
Answer» Improvements can be made by:
Improvements can be made by: |
|
| 3. |
Why Virtual Corporation Is Used? |
|
Answer» Virtual corporation is used to IDENTIFY those combinations of business and industry where technology is used to EXECUTE a WIDE array of TEMPORARY alliances in order to grasp specific market opportunities. With business becoming more COMPLEX and global, it is highly likely there will be more partnerships emerging among companies and entrepreneurs. Virtual corporation is used to identify those combinations of business and industry where technology is used to execute a wide array of temporary alliances in order to grasp specific market opportunities. With business becoming more complex and global, it is highly likely there will be more partnerships emerging among companies and entrepreneurs. |
|
| 4. |
On What Bases Time Study Methods Can Be Calculated? |
Answer»
|
|
| 5. |
What Environmental Controls? |
|
Answer» Environmental Controls SYSTEMS and equipment required for air and water pollution ABATEMENT GENERALLY carry increased fuel and maintenance labor and materials costs. REDUCTIONS in plant output resulting from the higher condensing pressures associated with cooling-tower operation or the added auxiliary power for stack GAS clean-up systems lower plant efficiency and increase fuel consumption. Environmental Controls Systems and equipment required for air and water pollution abatement generally carry increased fuel and maintenance labor and materials costs. Reductions in plant output resulting from the higher condensing pressures associated with cooling-tower operation or the added auxiliary power for stack gas clean-up systems lower plant efficiency and increase fuel consumption. |
|
| 6. |
What Is Industrial Engineering? How Important Are Statistics In Industrial Engineering? |
|
Answer» Industrial Engineering is an engineering of design of PRODUCTION systems. An Industrial Engineer ANALYZES and designs the whole system to integrate the components of people, MACHINES, and facilities to CREATE efficient and effective systems, which produce goods and beneficial services to humanity. Statistics are important to analyze the problem and controlling it for the GOOD production. Industrial Engineering is an engineering of design of production systems. An Industrial Engineer analyzes and designs the whole system to integrate the components of people, machines, and facilities to create efficient and effective systems, which produce goods and beneficial services to humanity. Statistics are important to analyze the problem and controlling it for the good production. |
|
| 7. |
What Is The Difference Between Productivity And Productive System? |
|
Answer» Productivity can be defined as the MEASURE of the amount of INPUT required to PRODUCE a given output or it can be also be defined as the ratio of output to input, whereas production system can be explained as a system in which a few INPUTS are given to get the required output through some transformation processes. Productivity can be defined as the measure of the amount of input required to produce a given output or it can be also be defined as the ratio of output to input, whereas production system can be explained as a system in which a few inputs are given to get the required output through some transformation processes. |
|
| 8. |
What Is Psychomotor Behavior? |
|
Answer» Psychomotor behavior is the activity of receiving sensory input signals and interpreting and physically responding to them. HUMANS can receive inputs by vision, HEARING, smell, and the cutaneous senses, which respond to temperature, mechanical energy, or electrical energy. Kinesthesis and the vestibular sense inform about location and position. Vision FOLLOWED by hearing are the most important senses for TRANSMITTING signals carrying complex information for decisions and for control of MMSs. Signals for warning or alerting need not be complex and can be transmitted by one or a combination of the sensory channels. The choice is determined by the situation and the task being performed by the person or persons to be warned rather than by differences in modality reaction times. Psychomotor behavior is the activity of receiving sensory input signals and interpreting and physically responding to them. Humans can receive inputs by vision, hearing, smell, and the cutaneous senses, which respond to temperature, mechanical energy, or electrical energy. Kinesthesis and the vestibular sense inform about location and position. Vision followed by hearing are the most important senses for transmitting signals carrying complex information for decisions and for control of MMSs. Signals for warning or alerting need not be complex and can be transmitted by one or a combination of the sensory channels. The choice is determined by the situation and the task being performed by the person or persons to be warned rather than by differences in modality reaction times. |
|
| 9. |
What Is Autofacturing? |
|
Answer» Autofacturing is a production system that is comprised primarily of automated equipment which is configured as several integrated subsystems, using one common database and computer controls to MAKE, test and transport specifically designed products at high and uniform quality levels meeting flexible specifications with a minimum of human effort. There are many levels of autofacturing from individual cells, all the WAY up to a complete and integrated system. Most situations are SOMEWHERE in between, but PROGRESSING toward a total system. Autofacturing is a production system that is comprised primarily of automated equipment which is configured as several integrated subsystems, using one common database and computer controls to make, test and transport specifically designed products at high and uniform quality levels meeting flexible specifications with a minimum of human effort. There are many levels of autofacturing from individual cells, all the way up to a complete and integrated system. Most situations are somewhere in between, but progressing toward a total system. |
|
| 10. |
What Are The Uses Of Time Standards? |
|
Answer» Various uses of time standards are:
Various uses of time standards are: |
|
| 11. |
What Are The Three Managerial Functions? Explain? |
|
Answer» To achieve the objective three managerial functions should be kept in mind:
To achieve the objective three managerial functions should be kept in mind: |
|
| 12. |
What Is The Purpose Of Departmental Classification? |
|
Answer» Departmental CLASSIFICATION is REQUIRED for:
Departmental classification is required for: |
|
| 13. |
What Are The Various Methods For Calculating The Cost? |
|
Answer» There are two methods for calculating the cost:
There are two methods for calculating the cost: |
|
| 14. |
What Is The Purpose Of Cost Accounting? |
|
Answer» The purposes of cost accounting require classifications of costs so that they are RECOGNIZED: • by the nature of the item (a natural CLASSIFICATION)
The purposes of cost accounting require classifications of costs so that they are recognized: • by the nature of the item (a natural classification) |
|
| 15. |
What Is A Profit Sharing Plan? |
|
Answer» It is a form of incentive in which each participating WORKER receives a periodic bonus in addition to a regular PAY only when the company earns a profit. A minimum profit is usually set aside for a return on invested capital, and beyond this AMOUNT, a percentage of profits goes into a pool to be shared by the employees. To protect the workers against adverse developments outside their control, some plans give the workers a bonus whenever the actual payroll dollars are less than the NORMAL amount expected for a given volume of production. It is a form of incentive in which each participating worker receives a periodic bonus in addition to a regular pay only when the company earns a profit. A minimum profit is usually set aside for a return on invested capital, and beyond this amount, a percentage of profits goes into a pool to be shared by the employees. To protect the workers against adverse developments outside their control, some plans give the workers a bonus whenever the actual payroll dollars are less than the normal amount expected for a given volume of production. |
|
| 16. |
What Are The Problems Involved With Queuing Theory? |
|
Answer» Matching of servers, which is provided to randomly arriving customers or services, which takes random amount of time, are the problems involved with Queuing theory. It is also known as waiting-line theory. Typical type of problems involved is, PEOPLE (or customers or PARTS) ARRIVE at a server (or machine) and wait in line (in a queue) until service is rendered. There MAY be one or more servers. Matching of servers, which is provided to randomly arriving customers or services, which takes random amount of time, are the problems involved with Queuing theory. It is also known as waiting-line theory. Typical type of problems involved is, people (or customers or parts) arrive at a server (or machine) and wait in line (in a queue) until service is rendered. There may be one or more servers. |
|
| 17. |
What Is Total Quality Control? Mention The Technical Standards |
|
Answer» The main objective of total QUALITY control is to provide defect free PRODUCTS in 100 percent of the time to meet the complete needs of the customer. It INVOLVES all the members in an organization who can affect the quality of the output - a product or service. ISO 9000 is a world standard for quality, it is a quality assurance management system, which is divided into four divisions on the basis of its technical standards:
The main objective of total quality control is to provide defect free products in 100 percent of the time to meet the complete needs of the customer. It involves all the members in an organization who can affect the quality of the output - a product or service. ISO 9000 is a world standard for quality, it is a quality assurance management system, which is divided into four divisions on the basis of its technical standards:
|
|
| 18. |
What Are The Major Disadvantages Of Product Grouping? |
|
Answer» The major disadvantages of product grouping are:
The major disadvantages of product grouping are: |
|
| 19. |
What Is A Plant Layout? |
|
Answer» For a good process to work smoothly, a proper layout is required. The main purpose of a plant layout should be low handling COST and low throughput time. There are TWO TYPES of plant layout:
For a good process to work smoothly, a proper layout is required. The main purpose of a plant layout should be low handling cost and low throughput time. There are two types of plant layout: |
|
| 20. |
What Is Process Planning? Mention Different Type Of Processes. |
|
Answer» PROCESS planning CONSISTS of selecting the best process, which can be used in the most advantageous way, selecting the specific tricks, fixtures, etc. to be used, and specifying the locating POINTS of the special tools and the speeds, feeds, and depths of cut to be EMPLOYED. The two DIFFERENT types of processes are mentioned below:
Process planning consists of selecting the best process, which can be used in the most advantageous way, selecting the specific tricks, fixtures, etc. to be used, and specifying the locating points of the special tools and the speeds, feeds, and depths of cut to be employed. The two different types of processes are mentioned below: |
|
| 21. |
What Are The Requirements Of A Good Organization? |
|
Answer» Requirements of a good organization are mentioned below:
Requirements of a good organization are mentioned below: |
|
| 22. |
What Is Process Analysis? |
|
Answer» PROCESS analysis is a procedure for studying all productive and nonproductive operations for the purpose of optimizing cost, quality, throughput TIME, and production output. These four criteria are not mutually exclusive and they are not necessarily negatively correlated. High quality with few if any rejects can result in high production output with low throughput time and cost. All four of these criteria need to be addressed if a facility is going to be a world competitor producing a quality product. In APPLYING process analysis to an existing plant producing a product line, the procedure is first to acquire all information related to the volume of the work that will be directed to the process under study, namely, the expected volume of business, the chance of REPEAT business, the life of the job, the chance for design changes, and the labor CONTENT of the job. This will determine the time and effort to be devoted toward improving the existing process or planning a new process. Process analysis is a procedure for studying all productive and nonproductive operations for the purpose of optimizing cost, quality, throughput time, and production output. These four criteria are not mutually exclusive and they are not necessarily negatively correlated. High quality with few if any rejects can result in high production output with low throughput time and cost. All four of these criteria need to be addressed if a facility is going to be a world competitor producing a quality product. In applying process analysis to an existing plant producing a product line, the procedure is first to acquire all information related to the volume of the work that will be directed to the process under study, namely, the expected volume of business, the chance of repeat business, the life of the job, the chance for design changes, and the labor content of the job. This will determine the time and effort to be devoted toward improving the existing process or planning a new process. |
|
| 23. |
Which Two Groups Of Management Manages The Control Organization And What Are Their Responsibilities? |
|
Answer» The two GROUPS of management control of organization is the responsibility of two groups of management:
The two groups of management control of organization is the responsibility of two groups of management: |
|
| 24. |
What Points Should Be Kept In Mind To Build An Effective Organization? |
|
Answer» Following principles should be kept in mind to BUILD an effective ORGANIZATION:
Following principles should be kept in mind to build an effective organization: |
|
| 25. |
What Is Plant Organization? |
|
Answer» Organization can be TERMED as distributing functions of a business to a qualified personnel to get the best output. Organization should be built around functions rather than individuals. In the past and to a large extent today, the majority of progressive concerns are organized on a line-and-staff basis. There are two types of organization:
Organization can be termed as distributing functions of a business to a qualified personnel to get the best output. Organization should be built around functions rather than individuals. In the past and to a large extent today, the majority of progressive concerns are organized on a line-and-staff basis. There are two types of organization: |
|
| 26. |
What Is Called Dc In Supply Chain Management? |
|
Answer» DC STANDS for DELIVERY challan which the transporter SUBMITS to consignee at the TIME of delivery of material and gets ACKNOWLEDGMENT. DC stands for delivery challan which the transporter submits to consignee at the time of delivery of material and gets acknowledgment. |
|
| 27. |
Why Are The Major Iron And Steel Industries In India Located In Eastern India? |
|
Answer» The MAJORITY of mineral deposits like iron ORE, manganese, copper, bauxite ETC. are concentrated in EASTERN India (e.g. Chota Nagpur plateau) The majority of mineral deposits like iron ore, manganese, copper, bauxite etc. are concentrated in eastern India (e.g. Chota Nagpur plateau) |
|
| 28. |
What Is Setup Time, Operation Time? |
|
Answer» Time REQUIRE MAKING SETTING Time require making setting |
|
| 29. |
What Is Productivity? |
|
Answer» Productivity is a measure of how much input is required to PRODUCE a GIVEN output i.e. output/input is CALLED productivity. Productivity is a measure of how much input is required to produce a given output i.e. output/input is called productivity. |
|
| 30. |
What Is Meant By Improving? |
|
Answer» Improving is GOING through better work ENVIRONMENT to reach higher productivity with better quality for the ACHIEVEMENT of the scheduled plane. Improving is the elimination of Non-Value ADDED Tasks. Improving is going through better work environment to reach higher productivity with better quality for the achievement of the scheduled plane. Improving is the elimination of Non-Value Added Tasks. |
|
| 31. |
Why Is Statistics Important In Industrial Engineering? |
|
Answer» It HELPS to know problem and control good PRODUCT and SIMILAR HEART MONITORING. It helps to know problem and control good product and similar heart monitoring. |
|
| 32. |
What Is A Production System? |
|
Answer» Production system is a system in which there are some INPUTS and some TRANSFORMATION processes GIVES required OUTPUT. Production system is a system in which there are some inputs and some transformation processes gives required output. |
|
| 33. |
What Is Industrial Engineering? |
|
Answer» Industrial Engineering is concerned with the DESIGN of production systems. The Industrial Engineer analyzes and specifies integrated components of PEOPLE, MACHINES, and facilities to create efficient and EFFECTIVE systems that produce GOODS and services beneficial to mankind. Industrial Engineering is concerned with the design of production systems. The Industrial Engineer analyzes and specifies integrated components of people, machines, and facilities to create efficient and effective systems that produce goods and services beneficial to mankind. |
|