1.

What is installed to transfer air into furnace in forced draught system?(a) Air blower(b) Tuyeres(c) Draft gauges(d) Cyclone separatorThe question was posed to me in exam.I need to ask this question from Draught System in section Steam Generators & Accessories of Energy Engineering

Answer»

Correct choice is (a) Air blower

To explain I would say: In FORCE draught SYSTEM an air blower is installed near the boiler which blows into the furnace. The PRESSURE of air throughout its path is above atmospheric pressure. This system also USES chimney to discharge hot flue gases into the atmosphere.