What is the maximum vertical deflection in industrial building for purlins and girts subjected to live load/wind load for elastic cladding?(a) span/150(b) span/180(c) span/250(d) span/100This question was posed to me by my college professor while I was bunking the class.Query is from Deflection & Holes in Beams topic in division Design of Beams of Design of Steel Structures |
|
Answer» The correct ANSWER is (a) span/150 |
|