1.

What Is The Rate At Which Toll Tax Is Collected?

Answer»

Once a highway is built, Fee is to be COLLECTED to RECOVER the cost. Once cost is recovered the fee is collected at REDUCED rate of 40% as the road is to be maintained in good condition for the travelers.

Once a highway is built, Fee is to be collected to recover the cost. Once cost is recovered the fee is collected at reduced rate of 40% as the road is to be maintained in good condition for the travelers.



Discussion

No Comment Found