What Should The Project Manager Look For In A Scheduling System?

Answer»

The THREE BASIC elements that the project scheduling systems should PROVIDE are; a common basis for communication at all OPERATIONAL levels of the project, a basis for regular status reporting, the use of the management by exception technique.

The three basic elements that the project scheduling systems should provide are; a common basis for communication at all operational levels of the project, a basis for regular status reporting, the use of the management by exception technique.