InterviewSolution
Saved Bookmarks
1. |
Which ash handling system can be built up in limited space?(a) Mechanical ash handling system(b) Pneumatic ash handling system(c) Hydraulic ash handling system(d) Steam jet ash handling systemI had been asked this question by my school teacher while I was bunking the class.This question is from Cool and Ash Handling System in section Steam Power Plant of Energy Engineering |
Answer» The CORRECT option is (d) Steam jet ash handling system |
|