InterviewSolution
Saved Bookmarks
| 1. |
A piece of work was finished by A, B and C together. A and B together finished 60% of the work and B and C together finished 70% of the work. Who among the three is most efficient?1). A2). Bangladesh3). C4). A or B |
| Answer» BANGLADESH is the ANSWER | |