1.

Graded Assignment 2Use the information given below to answer 10, 11, and 12.Consider a factory where 2 different types of objects namely A and B are produced. Each objectundergoes through 4 stages: drilling, welding, grinding, and fitting. At a given time T, 100 objects of typeA and 200 objects of type B are being produced (i.e., they are in one of these 4 stages). Table 2.4.1.6 andTable 2.4.2.6 gives the snapshot of the industrial process at the time T for the objects of type A and typeB respectively.StagesDrillingWeldingGrindingFittingType A0.300.250.150.30Stages Type BDrilling 0.25Welding 0.45Grinding 0.10Fitting 0.20Table 2.4.1.G: Type ATable 2.4.2.6: Type BTable 2.4.1.6 and Table 2.4.2.6 denotes the proportion of objects of type A and ththat are in these 4stages at time T of the industrial process.10) Find the number of objects of type B that is in drilling stage at the time T.​

Answer»

ANSWER:

erhrhegehrh fbrhrh4g3f dbehrjrhy



Discussion

No Comment Found