1.

Horizontal structural members placed at right angles to bridging joists are:(a) Binders(b) Girders(c) Screed(d) ToppingI had been asked this question during a job interview.This key question is from Floor Types in section Building Construction of Basic Civil Engineering

Answer» CORRECT OPTION is (a) Binders

Best EXPLANATION: Binders are provided to take the load of bridging joist and of floor toppings. Girders are placed to support binders. Screed is narrow strips of wood or bands of plaster laid on floor to act as guides to GET an EVEN surface for toppings. Top most lair of a floor is called toppings.


Discussion

No Comment Found

Related InterviewSolutions